Skip to content
TABCOMM Testing & Commissioning logo
  • Home
  • About Us
  • Our Team
  • Services
    • Commissioning
      • MEP Commissioning
      • HVAC Commissioning
      • HVAC Precommissioning
      • Electrical Commissioning
      • Fire Fighting Commissioning
      • Retro-Commissioning
    • Testing, Adjusting and Balancing
      • Air and Water Balancing (TAB)
      • Duct Leakage Testing
    • Validation and Indoor Air
      • Cleanroom Testing and Validation
      • IAQ Testing
      • Duct Cleaning
      • Sound and Vibration Testing
  • Projects
  • Insights
TABCOMM Testing & Commissioning logo
Contact us

Category: Insights

Retro-Commissioning: How Existing Buildings in the GCC Can Cut Energy Waste

Retro Commissioning - TABCOMM

Retro-commissioning finds the hidden faults that drive up energy use and comfort complaints in existing buildings. Here is how it works and what to expect.

Preparing for a Smooth Handover: A Commissioning Checklist for MEP Contractors

Engineer checking chilled water pipework and air handling units

Handover delays usually come from issues that could have been caught weeks earlier. This practical checklist helps MEP contractors get systems ready for commissioning.

TAB vs Commissioning: What Is the Difference and Why You Need Both

TAB engineers measuring airflow with a capture hood

Testing, adjusting and balancing and commissioning are often confused. Here is how they differ, how they connect, and why most projects need both.

Commissioning Healthcare Facilities in Saudi Arabia: Getting Critical Systems Right

Engineer checking chilled water pipework and air handling units

Hospitals and clinics depend on HVAC, pressure control and backup power working first time. Here is what healthcare commissioning involves and why it needs specialist attention.

MEP Commissioning in Saudi Arabia: A Practical Guide for Owners and Contractors

Commissioning engineer reviewing MEP plant room equipment on a tablet

What MEP commissioning actually covers, when it should start, and what owners and contractors in Saudi Arabia should expect at each stage of a project.

The Testing and Balancing Procedure According to NEBB Standards

Engineer carrying out duct leakage testing

How a testing and balancing procedure is structured under NEBB standards, from instrumentation and data collection to adjustments and reporting.

Common Site Issues During Testing and Air Balancing

Commissioning engineer reviewing MEP plant room equipment on a tablet

The site issues that most often affect HVAC testing and air balancing, and how planning and coordination help avoid delays.

Why HVAC Commissioning Matters Before Handover

Engineer reviewing BMS data at an air handling unit

What HVAC commissioning involves, why it matters for system performance and handover, and the main steps a commissioning team follows.

Why Testing, Adjusting and Balancing (TAB) Matters for HVAC Systems

TAB engineers measuring airflow with a capture hood

Why testing, adjusting and balancing (TAB) is essential for HVAC performance, comfort and efficiency, and the key steps involved in the process.

TABCOMM Testing & Commissioning logo

Independent testing, adjusting, balancing, and commissioning – backed by 12 years of hands-on field experience.

Quick Links

  • Home
  • About Us
  • Our Team
  • Our Projects
  • Contact Us

Commissioning Services

  • MEP Commissioning
  • HVAC Commissioning
  • HVAC Pre-Commissioning
  • Electrical Commissioning
  • Fire Fighting System Commissioning
  • Retro Commissioning

Our contact

  • +966541063269
  • Admin@tabcomm-ksa.com
  • Dammam Rd, Al Yarmuk, Riyadh 1325, Saudi Arabia

© Copyright 2026 TABCOMM . All rights reserved.